Horizontal Drilling for...
- Installation and replacement of pipes or cables without excavation with the shift hammers of ground.
- Auger Boring from 12″ up to 60″.
- Technical installation of metal pipes with the use of pneumatic hammers.
- Horizontal Directional Drilling with new methods and continuous renewal of technique.
- Horizontal Drilling in rocky grounds.
- Special Excavations – Trencher.
- Pile Driving at P/V park.
- Integrated solutions for fiber optic cable.
The company applies completed Management System of Quality based on standard ISO 9001: 2008
The company has the essential mechanic equipment and allocates big order from Trencher, various machines for special excavations and the essential mechanic equipment for horizontal directional drilling.