page-template-default,page,page-id-2531,page-child,parent-pageid-1438,bridge-core-3.0.5,qode-page-transition-enabled,ajax_fade,page_not_loaded,boxed,,qode-title-hidden,qode-theme-ver-29.2,qode-theme-bridge,disabled_footer_top,disabled_footer_bottom,qode_header_in_grid,wpb-js-composer js-comp-ver-6.10.0,vc_responsive

Petsoulas & SIA Ε.Ε. – ELEKTROMEK Α.Ε.

Horizontal Directional Drilling in a total six crossings for electricity interconnection project of Wind Power Generation System 23.1 MW at Agistro and 15 MW at SIdirokastro.  At four of the crossings, 3Ø200mm + 1Ø110mm HDPE pipes were installed with total length 980 m. and at the other two 4Ø200mm + 1Ø110mm HDPE pipes were installed with total length 1100 m.