Horizontal Drilling for...
- Installation and replacement of pipes or cables without excavation with the shift hammers of ground.
- Auger Boring from 12″ up to 60″.
- Technical installation of metal pipes with the use of pneumatic hammers.
- Horizontal Directional Drilling with new methods and continuous renewal of technique.
- Horizontal Drilling in rocky grounds.
- Special Excavations – Trencher.
- Pile Driving at P/V park.
- Integrated solutions for fiber optic cable.
The company implements a complete Quality Management System according to ISO 9001: 2015 standard and complies with the requirements of ISO 14001: 2015 Environmental Management System, ISO 27001: 2013 Information Security Management System.
The company has the essential mechanic equipment and allocates big order from Trencher, various machines for special excavations and the essential mechanic equipment for horizontal directional drilling.